

PIPELINE NDE
Weld examination for new pipeline construction
Automated UT, crawler radiography and scanner crews examine mainline girth welds as the spread advances, with records kept per spread and per weld from fit-up through hydrotest.
WHAT WE ADDRESS
New construction calls for weld examination that keeps pace with the spread: fit-up and bead profile checked visually, girth welds examined by automated UT or crawler radiography to the project specification, and field joint coating verified before the ditch closes. Records follow each weld through to hydrotest.
- Automated UT with phased array and TOFD for through-wall sizing.
- Crawler radiography where the specification calls for radiographs.
- Weld visual for bead profile, fit-up and repair welds.
- Field joint coating and holiday inspection before backfill.
HOW IT IS INSPECTED
WHAT THIS MEANS FOR YOU
Inspection that keeps pace with welding finds rejects while crews are there.
- Which welds are repaired on the spread.
- Whether the spread keeps its schedule.
- What goes into project turnover.
WHY TECHCORR
Purpose-built mainline crews and equipment, with quality systems written to your specification.
- Crew rotation for continuous spreads.
- NDT tied to integrity assessment.
- Crews mobilized from 14 locations.
WHAT YOU RECEIVE
- Weld images and AUT data per joint
- Accept or reject call per weld
- Digital turnover package per spread
NEXT STEP
Send the pipe size and wall, spread length, weld count, schedule and acceptance specification.
